Selected work / 2018-2026

Different places. Different building problems.

New buildings, careful alterations, and structural work across climates, materials, and construction traditions.

On site now

Pittsburgh, Pennsylvania

Field report 06

New steel frame under construction inside an existing brick foundry

Current / steel frame

Foundry Commons

A new independent frame is being threaded through the retained masonry shell. The work is sequenced bay by bay so stabilization, survey checks, and steel erection move together.

Now
East-bay steel and temporary bracing
Next
Roof diaphragm and masonry ties
Team on site
Architect, structural engineer, superintendent

Construction / 64%

Built work

Six projects, six conditions

01

Wicker Park House

Chicago, Illinois

Architecture + structural engineering

02

Field Library

Madison, Wisconsin

Architecture + civic interiors

03

Mesa Field Station

Sonoran Desert, Arizona

Research buildings + climate response

04

Penobscot Research Station

Penobscot Bay, Maine

Architecture + coastal structures

05

Rotterdam Warehouse

Rotterdam, Netherlands

Adaptive reuse + existing structures

06

Cascade Learning Center

Bend, Oregon

Architecture + mass timber coordination

Work shown here is arranged by building condition, not market sector.

Renovation / new construction / existing structures / field investigation